Pre- during and post-construction activities often require baseline monitoring and mitigation for marine life. In the absence of appropriate mitigation measures, construction activities associated with civil engineering projects, such as pile-driving or blasting, are likely to produce underwater noise and vibration levels capable of causing injury and disturbance to marine mammals.